AP
Adpack Limited
Shift Entry Portal
Username
Password
Sign In
Demo — user
supervisor
/ pass
adpack2026
AP
ADPACK
Shift Entry
Ready
—
?
Shift Report — Fill all sections before submitting
0%
Date
—
Shift
Select…
A — Day (07:00–19:00)
B — Night (19:00–07:00)
Supervisor
Looms
—
▼
Tapeline production (KG)
Changeovers (# of)
Total Loom Output — Target: 65,000 mts / shift
Total meters produced (all looms)
Total looms running
Breakdown (optional — for loom type detail)
Non-cement looms
Meters produced
# looms
HD looms
Meters produced
# looms
Multicolour looms
Meters produced
# looms
Leno looms
Meters produced
# looms
Converting
—
▼
Liner extrusion (KG)
Liner cutting (PCS)
Coating (Mts)
Auto print (Mts)
Autocut — Pieces per Machine
Autocut 1 (PCS)
Autocut 2 (PCS)
Autocut 3 (PCS)
Autocut 4 (PCS)
Convertex (PCS)
Gusseting (Mts)
Manual print 1 (PCS)
Manual print 2 (PCS)
Finishing
—
▼
Stitching machines (#)
Bags stitched
Liner teams (#)
Liners inserted
Total bags produced
Bags baled — customer / product description
Waste
—
▼
All values in KG
Tapeline
Looms total
Coating
Autoprint
Slitting
Autocut
Liner extrusion
2nd quality
Other waste
Lab / checking
Total Waste (KG)
0.0
Notes & Issues
Optional
▼
Stoppages, quality issues, equipment problems, observations
Clear
Submit Shift Report
Ready
—
—
+ New Entry
📸 Share Screenshot
Screenshot the card below and share to your WhatsApp group
Total Bags Produced
—
pcs
Total Looms Output
—
mts
Bags Stitched
—
pcs
Total Waste
—
kg
Looms
Converting
Finishing
Loom Targets
Waste Breakdown
KG
Notes
ADPACK LIMITED — SHIFT REPORT
ADPACK